THE GN250
    CAFE RACER

    THE GN250

    BASE BIKE

    Suzuki GN250

    BUILD TIME

    12 weeks

    COMPLETED

    2024

    THE STORY

    We got a pretty specific design remit for this unconventional GN250 rebuild and custom; but design aside - the aim was stripped back, streamlined and upgraded.

    The bike had been quite heavily customised previously, and we picked her up in a bit of a pickle - the engine itself was ok bar some dead gaskets, but block aside, the job was more or less a complete rebuild. Fried electrics, a wiring harness that resembled a bowl of spaghetti, bent rims, bars, worn suspension and brakes, a dead dash/ faulty controls and a choked up carb. Everything that was salvageable was expertly refurbished; everything else - replaced.

    From an aesthetic perspective, the owner's vision centered around a super slim and very angular Honda Federal tank - unique as hell - for which we had to fabricate an extension to allow it to flow seamlessly in to a new low-profile custom seat pan and upholstery. We re-worked and re-coated frame, re-spoked and re-coated the wheels, converted to a tidy dual exhaust, gave her a new set of shoes, controls, a custom battery box, and way way more. The only thing left outstanding is a new lick of tank paint.

    Full Job Spec - 1998 Suzuki GN 250 Full Rebuild: New Tank (customized), Seat, Re-work Frame, Install Hi-Flow Air Filter, Create Battery Box, New Wiring Harness, Turn Signal, Headlight, Bars, Levers, Grips, Tyres, Re-spoke and paint Wheels, Paint Frame, Paint Engine, Refurbish Front Forks, Refurbish Front Brake Caliper, Replace Cush Drive, Fabricate Speedo holder, Side Number Plate holder, Fabricate Seat, Dual Exhaust Conversion, Carburetor Refurb.

    GALLERY

    THE GN250 gallery 1
    THE GN250 gallery 2
    THE GN250 gallery 3
    THE GN250 gallery 4

    READY TO BUILD YOURS?

    let's turn your vision into reality